Start a Project
MDE INTERNATIONAL · WORLDWIDE

Interior design and construction for residences and hotels — delivered with certainty from Beijing to the world.

20 years in one craft · 300 verified construction standards · transparent budget · a named steward on every site

Choose your country on the globe — the site then speaks that country's language.
选择您所在的国家,进入后页面将以该国语言呈现:西班牙语 / 英语 / 意大利语 / 俄语 / 中文。
← 返回中文站(觅邸创新设计研究院)

LOADING GLOBE…
MDE · BEIJING → WORLD
拖动可旋转 · 滚轮缩放 · 点击金色标记,镜头推进到该国并展开项目,再点项目进入该国页面
10 COUNTRIES · 5 LANGUAGES · ONE STANDARD
01 / THREE TRACKS

What we do — and what we are known for

Two core practices, each with its own standard. The third card answers the question every overseas client asks first.
TRACK 01Residence
PRIVATE RESIDENCES
Core practice

A house is judged on the days you live in it, not on the render. Circulation, storage, concealed work and lighting decide everything.

  • Whole-home circulation & storage system
  • Concealed-works inspection regime
  • Scene-based lighting & complete furnishing
  • As-built archive & lifetime service
TRACK 02Hotel
HOTELS & HOSPITALITY
Core practice

A hotel returns money only if the space works. Title, structure and fire compliance come first — we do not design before the site passes our survey.

  • Site survey & condition due diligence
  • Brand strategy & product positioning
  • Room efficiency & cost control
  • SI standard for repeatable rollout
TRACK 03Global Delivery
HOW WE WORK ABROAD
The decisive question

“You have built in China — how do you manage a site in Barcelona or Singapore?” This page answers that, in writing.

  • Locally licensed contractor network
  • Cross-border supply chain control
  • Local code & fire compliance interface
  • Remote stewardship & response times

Residence — what a finished home must do

Four failures account for most of the problems clients report after handover. Each has a defined answer.
01Everything is awkward in daily use

Plans that look correct become unusable once furniture arrives — nowhere to put keys, shoes and coats; the coffee table owns the living room.

Our answerMovement is drawn from how people actually live — keys, shoes, cooking, eating, resting — before the plan is drawn. Storage heights are set to reach and bend, not to photograph.
02Storage was half-designed

Show flats are full of cabinets that hold nothing useful. Seasonal clothing, bedding, luggage, toys and bulk supplies end up in the living room.

Our answerWe inventory what you own, calculate the volume each category needs, and size the cabinetry to that number. The result is a storage point plan handed over at drawing stage.
03Concealed work is a gamble

Joints, splices and waterproofing disappear behind walls. A leak or a fault later means breaking tiles, with the neighbour's ceiling as the evidence.

Our answerPressure testing, water retention and insulation-resistance testing at every concealed stage. Every inspection sheet is signed three times — client, contractor and MDE — and archived.
04Paid for how it looks, not how it lives

One material throughout, one central light, a room that is stuffy, a bathroom that smells. The novelty fades and what remains is compromise.

Our answerFive standards — safety, durability, transparency, comfort, growth — applied as an acceptance checklist, plus lighting designed per activity rather than per fitting.
MDE 5A SPACE STANDARD

Five "An" — Five Dimensions of a Good Space

An (安) is where a space begins and where it ends. Safety, stability, ease of mind, joy of living, and room to grow — five forms of "An" define what MDE calls a good space. They are not a slogan; each one is an acceptance checklist item that can be signed, photographed and archived.

SafetyStructure · water & power · fire
StabilityMaterials · workmanship · joints
Ease of mindRecords · sync · traceability
Joy of livingLight · colour · touch
Room to growFlexibility · change over time
ONE "AN" ALL THE WAY THROUGH — THE 5A WAY OF LIVING

Hotel — where design has to answer to money

A residence fails slowly. A hotel that fails on opening day loses money from the first night.
01Designed first, then found impossible

Title is unclear, a load-bearing wall must stay, fire approval fails, the drainage vent cannot rise. The scheme is abandoned and the money is spent.

Our answerA condition due-diligence survey comes first. Title, structure, fire compliance and building services are measured and recorded with the source of every figure. If it cannot be built, we say so before a line is drawn.
02Looks good, does not sell

A beautiful lobby and rooms at the end of a dark corridor, with no defined market position — serving neither the business traveller nor the local guest.

Our answerCompetitive benchmarking and guest research before design. Market tier, target guest and price band are fixed first; circulation and space follow from who is coming and why.
03Cost overruns eat the margin

Building services are revised late, material specification drifts from the brand manual, and post-opening alterations accumulate one invoice at a time.

Our answerNine building systems resolved at design stage and priced in a written schedule before signature. Every variation reviewed and approved in writing before it is executed.
04The first hotel works; the second does not

Each property is designed from scratch, so standards live in drawings and informal instruction rather than in a document anyone can hand to the next opening.

Our answerAn SI standard for signage, public areas, rooms, materials and colour, with clear rules on what may vary. Plus an as-built archive so every technical decision remains traceable.
02 / PROJECT MAP

Where we have built

Projects delivered or currently in delivery across three countries. Click a highlighted country to see its projects.
Highlighted countries have delivered projects · Click to open
03 / GLOBAL DELIVERY

How we work abroad

We deliver abroad with locally licensed contractors while our own studio keeps hold of design intent, budget and quality. Here is exactly how that works — no generalities.
01Locally licensed partners

Construction in every market is executed by contractors holding that country's own licences — BCA registration in Singapore, the applicable national registration in Spain. MDE does not act as an unqualified contractor abroad.

  • Pre-qualified contractor pool per market
  • Fixed scope, fixed price, signed on-site contract
  • MDE holds the design and the quality standard — the contractor builds to our drawings and our 300-item craft manual
02Cross-border supply chain

Materials move through two channels, decided by specification and by schedule — not by convenience.

  • Locally sourced where the local specification is equal or better
  • China-sourced for bespoke joinery, hardware and finish items where local equivalents do not exist
  • Consolidated shipping with scheduled customs clearance
  • Substitution requires written approval — no silent swaps on site
03Local codes & compliance

We design to the code that applies where the building stands, and we check it at the survey stage — not at permit stage.

  • Singapore: BCA Code, SCDF fire requirements, accessibility
  • Spain / Europe: EN material standards, CTE and local fire regulation
  • Structural alterations reviewed by a locally registered engineer where required
04Remote stewardship

The service that clients value most is the one that keeps running when they are not on site.

  • On-site visits at least twice a week by a named MDE steward
  • Photo records and site logs issued to you the same day
  • Original design team checks progress at every key stage
  • One named steward, reachable directly — not a call centre
05Budget & transparency

Price is fixed before work starts, and the scope behind it is written down.

  • Equipment and finish schedule issued before contract signature
  • Every variation reviewed and approved by us before it is executed
  • No “necessary” items added mid-project without written sign-off
06How we respond across time zones

We state our commitments rather than our intentions.

  • Every inquiry answered within one business day (GMT+8)
  • First substantive opinion within 72 hours of receiving a brief
  • Site reports issued in your time zone where requested
  • Video walkthroughs scheduled on demand

Two markets, two emphases

EUROPESpain
Design craft · material standards · sustainable practice

Our European work leads with what our awards and standards support: finish quality, material specification, durability and compliance with EN codes and CTE.

What we lead with: 300-item craft manual · iF / ASLA / IFLA award record · EN-aligned technical practice · locally registered contractor partnership.
SOUTHEAST ASIASingapore
Programme certainty · cost control · cross-border logistics

Our Singapore work leads with certainty: programme, budget and site reporting controlled from Beijing, delivered by BCA-licensed contractors on site.

What we lead with: schedule certainty · transparent budget · cross-border supply chain control · daily site records regardless of time zone.
04 / PORTFOLIO

Selected projects

Every project below has been delivered or is in delivery. Click any to open its file.
05 / TEAM & RECOGNITION

The people and the record

Design leadership with international academic backgrounds, and work recognised by international juries.

Design leadership

International awards

Working languages

Project communication is conducted in these languages throughout — from first brief to final handover.

06 / HEADQUARTERS

Beijing headquarters

Our design studio, project management and construction control all sit in one place — which is why a site in Singapore and a suite in Madrid can be run to the same standard.
ADDRESS
TELEPHONE
/ China country code +86
EMAIL
General and project inquiries
STUDIO HOURS
DIRECT CONTACT
WeChat contact WeChat · scan to add
BEFORE YOU ASK

Frequently asked questions

Answers about working with MDE across borders, standards and project stages.
What makes MDE different from a local design firm?

A local firm starts with a site measurement and stops at handover. We start with a site survey before design and stay after handover. Every step is verifiable: 300 documented workmanship standards, signed inspection records at each hidden-work node (water lines pressure-tested at 0.8 MPa for 20 minutes, waterproofing flood-tested at 50 mm for 24 hours, acceptance sheets in three copies), a named steward as the owner's single point of contact, and a fixed price and scope signed before work starts.

Can you take a project outside mainland China, and who signs the contract?

Yes. Contracts are signed by our Beijing headquarters and communication stays in Chinese or English as you prefer; local licensed contractors execute the build under our supervision.

Who carries out construction on site?

Local licensed contractors build the project. MDE teams attend at key milestones for survey, setting-out and node acceptance, and keep the same inspection records used in our China projects.

How do you keep the same quality standard across different countries?

Our workmanship and node-acceptance standards are the baseline; materials, fire safety, permits and inspections are adapted to local codes. Both are documented in the project file.

Do you treat a private residence and a hotel differently?

Yes. A residence is judged by how it is lived in every day; a hotel is judged by whether each room can repay its investment. Our three tracks start from different questions. See "What we do" above.

What do you need from us to start a conversation?

Country and city, property type, approximate area, current stage, and the condition drawings you already have. No measurement is required at the first step — use the inquiry form below.

How are progress updates and site visits handled across time zones?

Drawings, schedules and site records are shared online; on-site attendance is planned around key milestones. Every node acceptance has photos and a signed record rather than a verbal report.

Are the projects shown on the map completed buildings?

The map shows city-level project locations with their stated status (Delivered / Operating / In progress / In design). Open a project card for its scope and imagery; we do not present renderings as built work.

How do we request a proposal or the company profile?

Use the inquiry form below, or ask for the Company Profile and the relevant site-survey template via the links in this section. Every inquiry is read by a designer, not a sales desk.

07 / INQUIRY

Tell us about your project

Every inquiry is read by a designer, not a sales desk. We reply within one business day.
By sending this form you agree that we may contact you about this project. We never share your details with third parties.