Choose your country on the globe — the site then speaks that country's language.
选择您所在的国家,进入后页面将以该国语言呈现:西班牙语 / 英语 / 意大利语 / 俄语 / 中文。
← 返回中文站(觅邸创新设计研究院)
A house is judged on the days you live in it, not on the render. Circulation, storage, concealed work and lighting decide everything.
A hotel returns money only if the space works. Title, structure and fire compliance come first — we do not design before the site passes our survey.
“You have built in China — how do you manage a site in Barcelona or Singapore?” This page answers that, in writing.
Plans that look correct become unusable once furniture arrives — nowhere to put keys, shoes and coats; the coffee table owns the living room.
Show flats are full of cabinets that hold nothing useful. Seasonal clothing, bedding, luggage, toys and bulk supplies end up in the living room.
Joints, splices and waterproofing disappear behind walls. A leak or a fault later means breaking tiles, with the neighbour's ceiling as the evidence.
One material throughout, one central light, a room that is stuffy, a bathroom that smells. The novelty fades and what remains is compromise.
An (安) is where a space begins and where it ends. Safety, stability, ease of mind, joy of living, and room to grow — five forms of "An" define what MDE calls a good space. They are not a slogan; each one is an acceptance checklist item that can be signed, photographed and archived.
Title is unclear, a load-bearing wall must stay, fire approval fails, the drainage vent cannot rise. The scheme is abandoned and the money is spent.
A beautiful lobby and rooms at the end of a dark corridor, with no defined market position — serving neither the business traveller nor the local guest.
Building services are revised late, material specification drifts from the brand manual, and post-opening alterations accumulate one invoice at a time.
Each property is designed from scratch, so standards live in drawings and informal instruction rather than in a document anyone can hand to the next opening.
Construction in every market is executed by contractors holding that country's own licences — BCA registration in Singapore, the applicable national registration in Spain. MDE does not act as an unqualified contractor abroad.
Materials move through two channels, decided by specification and by schedule — not by convenience.
We design to the code that applies where the building stands, and we check it at the survey stage — not at permit stage.
The service that clients value most is the one that keeps running when they are not on site.
Price is fixed before work starts, and the scope behind it is written down.
We state our commitments rather than our intentions.
Our European work leads with what our awards and standards support: finish quality, material specification, durability and compliance with EN codes and CTE.
Our Singapore work leads with certainty: programme, budget and site reporting controlled from Beijing, delivered by BCA-licensed contractors on site.
Project communication is conducted in these languages throughout — from first brief to final handover.
A local firm starts with a site measurement and stops at handover. We start with a site survey before design and stay after handover. Every step is verifiable: 300 documented workmanship standards, signed inspection records at each hidden-work node (water lines pressure-tested at 0.8 MPa for 20 minutes, waterproofing flood-tested at 50 mm for 24 hours, acceptance sheets in three copies), a named steward as the owner's single point of contact, and a fixed price and scope signed before work starts.
Yes. Contracts are signed by our Beijing headquarters and communication stays in Chinese or English as you prefer; local licensed contractors execute the build under our supervision.
Local licensed contractors build the project. MDE teams attend at key milestones for survey, setting-out and node acceptance, and keep the same inspection records used in our China projects.
Our workmanship and node-acceptance standards are the baseline; materials, fire safety, permits and inspections are adapted to local codes. Both are documented in the project file.
Yes. A residence is judged by how it is lived in every day; a hotel is judged by whether each room can repay its investment. Our three tracks start from different questions. See "What we do" above.
Country and city, property type, approximate area, current stage, and the condition drawings you already have. No measurement is required at the first step — use the inquiry form below.
Drawings, schedules and site records are shared online; on-site attendance is planned around key milestones. Every node acceptance has photos and a signed record rather than a verbal report.
The map shows city-level project locations with their stated status (Delivered / Operating / In progress / In design). Open a project card for its scope and imagery; we do not present renderings as built work.
Use the inquiry form below, or ask for the Company Profile and the relevant site-survey template via the links in this section. Every inquiry is read by a designer, not a sales desk.